50 Ton Chiller and Cooling Tower Replacement. Sigma Aldrich - Supelco Analytical North Harrison Road Bellefonte, PA
Completion Date: 2008
Working for PBCI - Engineering, I was responsible for the design of the Mechanical and Electrical systems for the replacement of an existing 50 Ton Water Cooled Chiller. The new chiller and cooling tower provide ample cooling for the many research of production labs as well as office spaces. The new cooling system will also provide increased energy savings and room for future expansion.
After a routine service call it was determined that the existing 50 Ton chiller and Associated Cooling Tower, were in dire need of replacement. The engineer and I selected an appropriately sized chiller and cooling tower and designed the supporting mechanical and electrical systems.